Saint Peter Long Term Care Facility
   St. Peter, Minnesota

 

Yanik Companies
has provided the
City of St. Peter and the
Benedictine Health System with

PROJECT SUPPORT AS NEEDED

  • IN A TIMELY MANNER
  • APPROPRIATELY
  • COST EFFECTIVELY

 


Entry Canopy

 

Covered Entry

 

Resident Bed Area - 2 Patient Room

 

Resident Unit Serving Kitchen

 

St. Peter Long Term Care Facility
St. Peter Minnesota

Yanik’s role:
- Project Development,
- Project Construction Management

- 65,000 square foot facility on the St. Peter Community Hospital Campus

- 80 Patient Skilled Nursing Facility

- Planning Commenced June 2004.

- Construction began in October 2005.

- Opened for Patients January 2007
- Corridor links the St. Peter Long Term Care facility to the St. Peter Community Hospital  
- Dietary and Laundry developed for the skilled nursing supplie the adjacent hospital

- Project Architect of Record:
         Paulsen Architects, Mankato, MN
- Senior Care Consulting Architect
         Nelson Tremain Architects,
         Minneapolis, MN

After the City of St. Peter, MN  determined that it preferred not to manage its skilled nursing facility the Yanik Companies introduced the Benedictine Health System to the Hospital and City of St. Peter as a possible partner for the new replacement to its existing skilled nursing facility. 

Yanik Companies had earlier served as the Program Manager for the City and the St. Peter Community Hospital assisting the City in selecting the new site and preparing a master campus plan that would include a new Critical Access Hospital, complete Senior Campus to include long term care, assisted living and independent living apartments and a Medical Office Building on the new 28 acre site.

The new site was selected with the intention that the new St. Peter Community Hospital would serve as the dominant element.  The new Critical Access Hospital opened in August 2004. The new Living Community of St. Peter is a direct result of those discussions.  Planning, programming and design began in June of 2004 and the facility opened January 2007. 

This $13 Million 65,000 square foot project is designed for 80 residents.  The four wings each hold 20 residents in settings that allow for maximum flexibility of services or segregation by client type. 

Each patient bed area is designed for maximum privacy The double occupancy suites are designed as two separate bedrooms that share a bath.

The dietary and laundry services constructed with this facility support both the long term care facility and the attached St. Peter Community Hospital.  They are sized to permit expansion of services for future Seniors  programmatic needs.

With the opening of this facility in January of 2007 the existing skilled nursing services was relocated to the new St. Peter Community Hospital Campus. The facility is owned by the City of St. Peter and leased to and operated by the Benedictine Health System

YANIK COMPANIES AS PROJECT MANAGER AND CONSTRUCTION MANAGER

Yanik Companies assisted the City of St. Peter with multiple elements of this project to get it underway and to achieve the final project on time and within budget. 

Yanik provided assistance to the City in site selection, oversight during space programming, input to financing, project management and construction management service during the various stages of the project. 

     

Entry Lobby

Resident Corridor with Lounge & Dining Room